MPCA Outlines Stormwater Requirements

25 Nov 2019 1:28 PM | Colleen Corrigan (Administrator)

by Jane DeAustin, CMBA (excerpt from page 10 CMBA December On The Level Magazine)

CMBA is Watching:  The Draft MS4 General Permit from the Minnesota Pollution Control Agency outlines stormwater requirements that will result in increased site inspections and improvements, specifically related to post-construction. 

MCM 5: Post-construction stormwater management Draft MS4 General Permit Reference: Items 20.6 and 20.7

Read the full article - Draft Permit - MNR040000 - 2019 - summary of new items.pdf


 


CMBA:
1124 West Saint Germain Street, St. Cloud MN 56301
320.251.4382 info@cmbaonline.org | www.cmbaonline.org
Powered by Wild Apricot Membership Software